Past, present and future

Today, more than 50 years later, the company has reached a level of professionalism and commercial success that would have been difficult to imagine in its beginnings and has become a leader in the sector.

The story begins

Broiler fattening.

1963

Construction of the first farm

For broiler fattening.

1967

Construction of the first factory

Broiler feed.

1970

Start of Hatching Egg Production

Breeding hens.

1981

Construction of the first chicken coop

"Dark ships" method.

1982

Constitution of the company

In Public Limited Company

1985

Construction of new factory

Feedingstuffs for breeders.

1991

Plant construction

Hatchery.

1992

Construction of new factory

Feedingstuffs with UP/C technology.

1998

Acquisition of slaughtering and processing plants (CPA)

Renovation of slaughter plant.

2000

Construction of new plant

Processed and elaborated.

2002

New deboning technology

In the processing plant.

2005

Renewal of machinery

In slaughter plant and cold tunnel.

2006

New Wastewater Treatment Plant (EDAR)

At the Poultry Processing Centre (CPA).

2009

New software

Improved traceability in feed production.

2010

Renewal of equipment in the halls

Production and rearing, feeding line and automatic egg collection.

2011

Washing tunnel

Live chicken module in CPA.

2012

New X-ray technology

In processing plant for food safety assurance.

2013

Start of lighting replacement project

LED in CPA and on breeder farms.

2014

Renewal of corporate image

Achievement of GLOBAL GAP and IFS certification.
Significant renewal in several CPA lines.

2015

Labelled in C

Implementation of labelling equipment in C.

2017

ATLAS system

Implementation of the ATLAS system.
Achievement of Animal Welfare certification.

2019

Renewal of equipment

Renewal of all positive and negative refrigeration equipment.

2020

New Headquarters

We unify offices in the new facilities in Leganés.

2021